← Tough
Clients/Tough/SMR/slack/2025/04/2025-04-21_tough-smr.md
Content
# #tough-smr — 2025-04-21
**09:56 [andy](https://slack.com/archives/C08NFJSU753/p1745254595116399):** I have a four pump water booster station that I need programmed when SMR is done. Just a heads up.
**09:57 [Mason Radke](https://slack.com/archives/C08NFJSU753/p1745254663434939):** packaged skid like the grundfos? or do we have full control from the PLC?
**09:57 [andy](https://slack.com/archives/C08NFJSU753/p1745254674649619):** I’d like to use P_LLS
**09:58 [andy](https://slack.com/archives/C08NFJSU753/p1745254683153269):** Full control
**09:58 [Mason Radke](https://slack.com/archives/C08NFJSU753/p1745254689555169):** sounds good!
**09:58 [andy](https://slack.com/archives/C08NFJSU753/p1745254718587529):** Ignition edge
Extracted Entities
| Type | Key | Value | Confidence | Evidence |
| site |
water booster station |
four pump water booster station |
90% |
I have a four pump water booster station that I need programmed |
| system |
Ignition Edge |
Ignition edge |
95% |
Ignition edge |
| system |
PLC control |
full control from the PLC |
80% |
or do we have full control from the PLC? |
File: Clients/Tough/SMR/slack/2025/04/2025-04-21_tough-smr.md
Updated: 2026-02-19 20:30:13.768935