← Tough

Clients/Tough/CCSD/slack/2025/08/2025-08-12_ccsd-water-ignition.md

slack
Source
1
Chunks
5
Entities
Doc
Type

Content

# #ccsd-water-ignition — 2025-08-12 **08:09 [andy](https://slack.com/archives/C08TVA84PD4/p1755011347837209):** Thanks for the update on your work situation. I think that will be much better. Overview looks decent, SSWF wells and P-1500, 16, 17 are the same. Just remove the SSWF wells as they don't work that way, and the overview screen looks ok. I just noticed WBE well isn't on the overview, I'm not sure if it is on the drawings but it is a monitoring well you can place anywhere for now. Probably bottom left where the SSWF wells were is good enough. Not piped anywhere. I have created layer 2 screens and all objects exist on those pages, so please use those pages (N-201 through N-251). There are large and small displays and the main view uses a breakpoint to display the ipad view (s) and the desktop view (L) I have all the objects on the large display view right now, and then we can shrink them down for the ipad view after we get everything nailed down on the large view. This should reduce double-work. If you need another meeting to get your head back in it, I would rather do that then have to go back and correct things. Some different projects are starting to ramp up and I was hoping to have all of this done before it competes with the other projects. I think we may be past that point, but will you have time to commit to this project this week? Faceplates have been updated since Santa Margarita Ranch with a handful of features. I created a click plate on the SSWF on your overview screen (the one I created was in embedded views) to navigate to one of the views to give you an idea of what I have created so far. @Kevin to stay in the loop.

Extracted Entities

TypeKeyValueConfidenceEvidence
contact Person Name andy 90% 08:09 [andy](https://slack.com/archives/C08TVA84PD4/p1755011347837209)
contact Person Name Kevin 80% @Kevin to stay in the loop.
site Client Name Tough 100% Client: Tough
site Project Site CCSD 90% Clients/Tough/CCSD/slack/2025/08/2025-08-12_ccsd-water-ignition.md
system System Name Ignition 95% #ccsd-water-ignition — 2025-08-12
File: Clients/Tough/CCSD/slack/2025/08/2025-08-12_ccsd-water-ignition.md
Updated: 2026-02-19 20:30:24.579636