← SSLOCSD
Clients/SSLOCSD/evernote/Instrument_electrical_work.md
Content
# Instrument electrical work
![[Instrument_electrical_work_Snapshot_4.jpg]]
Add jbox at A and tie in conduit B
Run 1/2 for power and signal to hot water meter
![[Instrument_electrical_work_Snapshot_5.jpg]]
RunĀ 1/2 power and 1/2 signal from comm box to meter
![[Instrument_electrical_work_Snapshot_6.jpg]]
![[Instrument_electrical_work_Snapshot_7.jpg]]
Run 3/4 power and 3/4 signal from these conduits to flow meters
Extracted Entities
| Type | Key | Value | Confidence | Evidence |
| _no_entities |
backfilled |
|
0% |
|
File: Clients/SSLOCSD/evernote/Instrument_electrical_work.md
Updated: 2026-02-19 22:10:09.400690