← SSLOCSD

Clients/SSLOCSD/evernote/Instrument_electrical_work.md

evernote
Source
1
Chunks
1
Entities
Doc
Type

Content

# Instrument electrical work ![[Instrument_electrical_work_Snapshot_4.jpg]] Add jbox at A and tie in conduit B Run 1/2 for power and signal to hot water meter ![[Instrument_electrical_work_Snapshot_5.jpg]] RunĀ  1/2 power and 1/2 signal from comm box to meter ![[Instrument_electrical_work_Snapshot_6.jpg]] ![[Instrument_electrical_work_Snapshot_7.jpg]] Run 3/4 power and 3/4 signal from these conduits to flow meters

Extracted Entities

TypeKeyValueConfidenceEvidence
_no_entities backfilled 0%
File: Clients/SSLOCSD/evernote/Instrument_electrical_work.md
Updated: 2026-02-19 22:10:09.400690