| server |
Telemetry Data Path |
Booster PLC -> Modbus over 900MHz radio -> SCADA AB PLC -> Primary Ignition SCADA |
100% |
Booster PLC hands off telemetry data via Modbus over the 900MHz radio -> SCADA AB PLC -> Primary Ignition SCADA |
| server |
PLC Project File Link |
https://drive.google.com/file/d/1BJ80_6c8R-zclSzFrsWtgqYCvhJo0exh/view?usp=drive_link |
100% |
WaterBoosterVFD.ACD Google Drive Link |
| server |
Panel Drawings Link |
https://drive.google.com/file/d/1PkUDI1mPvSRilvdYjtJLvSxiBQKnzM0X/view?usp=drive_link |
100% |
this link is my panel drawings for this project, this panel has been built and is mounted on site |
| server |
Local HMI Connection |
Ethernet connection between Ignition Edge and AB PLC |
100% |
AB PLC on site will just connect to Ignition Edge via the Ethernet local connection and using the AB Ignition drive |
| server |
Telemetry Radio Frequency |
900MHz serial communications |
100% |
Radio: 900MHz serial communications |
| server |
Telemetry Protocol |
Modbus |
100% |
Protocol: Modbus |
| site |
Pump Configuration |
4 Pumps: Pump 1 & 2 VFD Duty, Pump 3 ATL Duty, Pump 4 ATL Fire Pump |
100% |
Pump 1: VFD Duty Pump, Pump 2: VFD Duty Pump, Pump 3: ATL Duty Pump, Pump 4: ATL Fire Pump |
| site |
Project Site |
City of Paso - Water - Orchard Bungalow Booster |
100% |
Project Summary: City of Paso - Water - Orchard Bungalow Booster |
| system |
HMI System |
Ignition Edge HMI |
100% |
Local HMI (Ignition Edge): Acts as an "island" (no direct connection to the Ignition Primary SCADA gateway) |
| system |
PLC System |
Allen-Bradley PLC |
100% |
The system utilizes a mix of VFD and ATL pumps controlled via an Allen-Bradley PLC |
| system |
VFD Drives |
Eaton drives (Generic Variable Speed Drive objects) |
100% |
VFDs: Eaton drives (Generic Variable Speed Drive objects) |
| system |
Primary SCADA System |
Ignition Primary SCADA |
100% |
telemetry sent to the primary SCADA system via radio |
| task |
Ignition Edge HMI Programming |
Andy |
100% |
Andy: Handling Ignition Edge HMI programming and SCADA side telemetry |
| task |
PLC Programming |
Mason |
100% |
Mason: Needed for the PLC side programming |