# Project: Cambria CSD Water Ignition Phase 3 Ignition Phase 3 ✅Replace Opto 22 S1 controller functions with AB Compactlogix 5069-L330ER ✅Use Prosoft Modbus TCP gateway (on site and installed) to create timed messages to each IO site Writing messages to the IO will override live system, we will want to schedule this when ready to test CCSD Water Project Backups IO Configs Opto learning center PAC Control config file The learning center IP is 192.168.102.91 Uses PAC Project 10.4c or higher Install professional version using this password: 05Apollo18 This software provides this view: PAC Manager provides the Modbus calculator CCSD Water Ignition Phase 3 Tags - updated This is the current version of IO and P&ID tags: https://docs.google.com/spreadsheets/d/12DObnBd5r5nWkdom1YDtSgJxO8dVcEX3k4dxl6IqeR8/edit?usp=sharing Use application code manager to instantiate the process object library. 192.168.102.251 66 CCSD Water SCADA AB PLC Compactlogix .67 is modbus gateway, linked to PLC already Already linked to Ignition Project Outline 1. Planning 1. ✅Develop P&IDs for system 1. ✅Overview 2. ✅Boosters 3. ✅PK 4. ✅SSWF 2. ✅Develop Tag list based on P&IDs 2. RTU List RTU1100 Leimert RTU1200 Pine Knolls (PK) RTU1300 SR3 RTU1400 Stuart RTU1500 SSWF W1 RTU1600 SSWF W2 RTU1700 SSWF W3 RTU1800 Fiscalini RTU1900 WBE RTU2000 SR4 RTU2100 Rodeo RTU3000 WRF SCADA 3. Programming 1. PLC 1. ✅IP address at live network 192.168.102.251 2. ✅IP address at dev network 192.168.1.150 3. ✅PAX Objects 1. ✅Build PAX object list in spreadsheet 2. ✅Create ACM project to create project with PAX objects 4. ✅Modules 1. ✅Create and configure Prosoft Modbus TCP module 2. ✅IP address at live network 192.168.102.67 5. Control Strategies 1. Use Mason’s MCR Process Control Data Type v1.0 2. Use the PAX Objects to control the pumps, then this allows for the SCADA Hand and SCADA Auto functionality to work. 3. Allow the user to initiate an auto call, without having the change the setpoints to simulate an auto call 4. All Motors: HOA not in Auto takes out of call service (accomplished by P_Motor object input permissive and interlock) 1. Fault takes out of call service (accomplished by P_Motor object becoming not available due to fault input) 5. SSWF (W1, W2, W3) 1. All 3 wells are called by individual on/off setpoints looking at Pine Knolls, no lead lag alternation 2. Has Ignition Edge at W2 to handle historical data to the primary gateway 6. Stuart and Rodeo Grounds Boosters 1. Rodeo Grounds Booster references Stuart St. Tank Level 2. Stuart St Tank Level references Fiscalini Tank Level 3. Both Boosters are the same 4. 2 Pump Boosters, lead lag alternation 1. Lead On/Off 2. Lag On/Off 3. When building this logic, use these tags that exist within the P_AinAdv object that they reference 5. HOA not in Auto takes out of call service (accomplished by P_Motor object input permissive and interlock) 6. Fault takes out of call service (accomplished by P_Motor object becoming not available due to fault input) 7. SR3 and SR4 Well Call 1. Both wells are called by individual on/off setpoints looking at Pine Knolls, no lead lag alternation 2. Even though SR3 is not functional, write the logic to call it anyway. 3. Both SR3 and SR4 are individual self controlled treatment plants 1. SR4 has been updated and is running its own Ignition Edge Project that is linked to the Ignition gateway to provide historical data and alarms 2. SR3 has not been updated and runs on Opto 22 PLC, using Ignition edge only as a historical data handler 4. Communications - reference CCSD Water Project Backups IO Configs 1. Reference this spreadsheet for IO Point correlation with Modbus addresses 1. https://docs.google.com/spreadsheets/d/1v5gXvtNvfIo58OJE3jPbdhaI5_uVJG3G/edit?usp=drive_link&ouid=105974013212587964753&rtpof=true&sd=true 2. Andy to get screenshots of IO config within Opto 22 PAC Control 2. Use Page/Embedded/Comms page to develop UI on 3. How does the Prosoft handled method handle these things: 1. Create Program that creates sequential messaging (message RTU 1100, and once it gets DN or ER, move on to RTU1200) to each RTU with the following features: 1. Polling time between cycles display 1. Alarm if greater than 60 seconds or count the errors, greater than x, lets pick one 2. Escalating attempt intervals (user editable, global intervals: internal 1- 10 seconds, interval 2 60 seconds, interval 3 300 seconds) 3. Ability to disable polling a particular RTU by user 4. WRF is an Allen Bradley Compactlogix Controller that can be messaged explicitly, this is what the Opto 22 controller is doing now, we can replace that functionality with the new SCADA controller, all other RTUs are Opto 22 SNAP PAC R1 or EB1 controllers. Prosoft Device Status and Error Codes 1. Modbus Client Command Error Codes The most critical diagnostic for a SCADA integrator is the Command Error List. Each of the 160 possible Modbus commands has an associated error code. * Where it lives: By default, these start in the gateway's internal database at register 4000 (this can be moved in ProSoft Configuration Builder). * What it tells you: * 0: Success. * 1: Timeout (Target device is down or network path is broken). * 2-6: Modbus Exception codes (e.g., Illegal Function, Illegal Data Address). * Implementation: Map these registers to your CompactLogix Input tags. If a register is non-zero, you know exactly which device or specific poll is failing. ________________ 2. General Module Status (Health Tags) The gateway maintains a block of "Status Data" that provides a high-level overview of the module’s health. * Standard Status Block: Includes the product name, revision, and uptime. * Error Counters: Total number of Modbus messages sent, received, and errors encountered. * Connection Status: Number of active Modbus TCP client/server connections. * Access: In ProSoft Configuration Builder (PCB), you can use the Data Map feature to move these status registers (starting at upper memory locations like register 12000) down into the user-accessible database (0–9999) so they can be read by the PLC. 1. 4. Alarms: 1. ROC 2. Watchdog, create AOI 3. tank flatline use existing AOI 4. Tie in Comm fails into each device IO Fault on the PAX object that it is affected by 1. HMI (Human-Machine Interface) Additions * Ribbon Charts for Pump Status 1 * ✅Import Resource * ☐ Configure a ribbon chart for any motors in a given loop * ☐ Implement a separate ribbon chart on each loop section that contains pumps4. * Alarm Analysis Tool 5 * ✅Import Alarm Analysis Tool * Look into Alarm Description to be referenced, not tag name * System Diagnostics Screen 8 * ✅Import System Diagnostics resources * ☐ Make sure appropriate systems are included or excluded from old configurations 2. Mobile User Interface (UI) * ☐ Develop a mobile-friendly version of the SCADA project12. 3. Reporting * Gallons Per Day (GPD) Report 16 * ☐ Create a new report that details the GPD for each individual well site17. * Daily Production Report 18 * ☐ Configure the system to automatically generate a production report every day for the preceding 24-hour period19. * ☐ Implement a real-time display showing a rolling 24-hour production total20. * ☐ Ensure the real-time production data is pulled into Ignition, historized, and updated every 15 minutes21. * Daily Demand Report 22 * ☐ Configure the system to automatically generate a demand report every day for the preceding 24-hour period23. * ☐ Implement the demand calculation: Demand = Total Production - Change in Total Storage24. * ☐ Create a real-time display showing a rolling 24-hour demand result25. * ☐ Ensure the real-time demand data is pulled into Ignition, historized, and updated every 15 minutes26. Tank storage volumes as function of height Tank Site Tank Qty. ID Tank 1, ft ID Tank 2, ft Vol/ ft H, Tank 1 Vol/ ft, Tank 2 Tot. Vol./ ft, gal Pine Knolls 2 52 ft 52 ft 15,886.5 gal 15,886.5 gal 31,772.9 gal Stuart St. 2 40 ft 30 ft 9,400.3 gal 5,287.7 gal 14,687.9 gal Fiscalini 1 46 ft 0 ft 12,431.9 gal 0.0 gal 12,431.9 gal Leimert 1 38 ft 0 ft 8,483.7 gal 0.0 gal 8,483.7 gal D = P - ΔV (System Demand t0-t1) = (Total Production t0-t1) - (Change in Total Storage t0-t1) Where (Total Production t0-t1) is the sum of production from all sources between time 0 and time 1 in MG; and, (Change in Storage) t0-t1 is the total change in volume in storage between time 0 and time 1 in MG, calculated as Vol at t=1 minus Vol at t=0 E.g. Demand Aug 1st. = Production Aug. 1st - (Vol Aug 1st - Vol Jul 31st) Prod Aug 1st = 5 MG Vol in storage Aug 1st = 11 MG Vol in storage Jul 31st = 12 MG (between Jul 31st and Aug 1st we lost 1 MG from storage Demand Aug 1st = 5 - (11-12) = 6 MG 4. System Resiliency and Alarming * Disaster Recovery Solution 27 * ✅Procure a new 24" industrial panel mount touchscreen28. * ☐ Install the new touchscreen and PC at the Pine Knolls site, replacing the existing Windows 7 machine29. * ☐ Configure the new panel to be ready for an automated gateway backup restoration from the off-site hard drive30. The goal is to enable full SCADA control from Pine Knolls in an emergency31. * ☐ Move the NAS and Backup PLC to pine knolls * Watchdog Alarms for State Reporting 32 * ☐ Integrate watchdog alarms for every individual tag associated with state reporting data33. * ☐ Program the watchdog to monitor that each tag value changes within a set time period to prevent stale data34. * ☐ Program the watchdog to also monitor for significant value changes over a longer time period to ensure data is live and accurate35. ☐ Ensure an alarm is triggered if a tag has bad quality, even if the communication link to the controller is active36. Standard RTU Signals: All discrete P_DIn a. Generator i. Generator - Normal Power Available ii. Generator - Emergency Power Available iii. Generator - Fail b. Utility Power – Available (120VAC supply power to 120VAC Relay) c. UPS i. UPS – DC IN OK ii. UPS – BATT OK iii. UPS – DC OUT OK d. Comm Status 1. Boosters a. Suction Pressure b. Discharge Pressure c. Flow i. Rate ii. Totalizer 2. Wells a. Well Level b. Flow i. Rate ii. Totalizer 3. Pumps: a. Output: i. Run Command ii. Reset b. Input:s i. Run Feedback ii. Fault iii. HOA in Auto

Extracted Entities

TypeKeyValueConfidenceEvidence
credential PAC Project professional version password 05Apollo18 95% Install professional version using this password: 05Apollo18
server CCSD Water SCADA AB PLC Compactlogix dev network IP 192.168.1.150 90% IP address at dev network 192.168.1.150
server Prosoft Modbus TCP gateway IP 192.168.102.67 90% IP address at live network 192.168.102.67
server Opto learning center IP 192.168.102.91 90% The learning center IP is 192.168.102.91
server CCSD Water SCADA AB PLC Compactlogix live network IP 192.168.102.251 90% IP address at live network 192.168.102.251
site RTU1500 site SSWF W1 80% RTU1500 SSWF W1
site RTU1700 site SSWF W3 80% RTU1700 SSWF W3
site RTU1800 site Fiscalini 80% RTU1800 Fiscalini
site RTU1900 site WBE 80% RTU1900 WBE
site RTU2000 site SR4 80% RTU2000 SR4
site RTU2100 site Rodeo 80% RTU2100 Rodeo
site RTU3000 site WRF 80% RTU3000 WRF
site RTU1600 site SSWF W2 80% RTU1600 SSWF W2
site RTU1100 site Leimert 80% RTU1100 Leimert
site RTU1200 site Pine Knolls (PK) 80% RTU1200 Pine Knolls (PK)
site RTU1300 site SR3 80% RTU1300 SR3
site RTU1400 site Stuart 80% RTU1400 Stuart
system SCADA system Ignition 90% SR4 has been updated and is running its own Ignition Edge Project
system PLC system Allen Bradley Compactlogix 5069-L330ER 90% Replace Opto 22 S1 controller functions with AB Compactlogix 5069-L330ER
system Prosoft Modbus TCP gateway Prosoft Modbus TCP gateway 90% Use Prosoft Modbus TCP gateway (on site and installed)
File: Clients/Tough/General/gdocs/Project__Cambria_CSD_Water_Ignition_Phase_3.md