| server |
Cable between CP101 and SCADA RTU |
Cat5E shielded cable |
80% |
Run Cat5E shielded cable between CP101 and SCADA RTU. |
| site |
Project site |
Waller Park Tank and Boosters |
100% |
WALLER PARK TANK AND BOOSTERS |
| site |
Control panel location |
RTU panel separate from 480V Service Pedistal, wall mount enclosure under shade structure |
80% |
The RTU panel will be separate from the 480V Service Pedistal, in a wall mount enclosure under the shade structure |
| system |
PLC in CP110 |
Allen-Bradley Micro850 or Compact Logix |
90% |
The PLC in CP110 shall be Allen-Bradley Micro850 or Compact Logix. |
| system |
Level transmitter |
Rosemount 2088 |
90% |
LEVEL TRANSMITTER - Rosemount 2088 with local operator interface |
| system |
Optional flow meter |
Cla-Valve model X144D vortex shedding insertion electronic flow meter |
90% |
Add a Cla-Valve model X144D vortex shedding insertion electronic flow meter. |
| system |
Enclosure requirements |
NEMA 4X with A/C units and rigid foam insulation |
85% |
Control panels and Booster VFD panel shall have A/C units, and be insulated with rigid foam insulation |
| system |
VFD communication protocol |
Ethernet I/P network |
80% |
VFDs to be controlled and monitored by Ethernet I/P network. |
| task |
Add 480 volt power alarm |
From CP-110 to SCADA |
80% |
Add a 480 volt power alarm from CP-110 to SCADA |
| task |
Add analog output |
From SCADA RTU to ClaValve flow controller for flow setpoint |
80% |
Add an analog output from the SCADA RTU to the ClaValve flow controller |
| task |
Add pressure transmitter |
On inlet side of ClaValve connected to SCADA RTU analog input |
80% |
Add a pressure transmitter on the Inlet side of the ClaValve and connect to an analog input |
| task |
Mount radio enclosure |
Inside safety rail for safe access |
80% |
Please add a note to mount the Radio enclosure on the inside of the safety rail |