← Laguna

Clients/Laguna/evernote/Laguna_Sanitation_Service.md

evernote
Source
1
Chunks
1
Entities
Doc
Type

Content

# Laguna Sanitation Service Add a feed setpoint to the RO chem pumps for running on 1, 2, and 3 RO's. Currently they have to manually adjust the setpoints Add ORP scaling points to SCADA Brine station HI PSI shutdown Calibrations pH probe for RO Feed water (they run the PID loop in manual because the location of the probe. It takes too long for a response to the chemical change. Possibly need to relocate the probe.) RO feed water flow rate setpoints revert back to defaults when the feed tank level reaches the decrease RO setpoint Replace LT on the RO feed tank - spec'd a transmitter 3/19 Add Zeeweed and Zenogem data to Daily Report RW Warfhead solar RW Pump Station trends — PIT 8100 Increase scale to 200 psi. Add new recycled water tank Make the shutdown alarm for the RO units only happen when they shutdown abnormally, not when the operator shuts them down. RW Pump pressure spike control Historian and reports. RW flow meter corrections Remove disable bits in RW code Remove low psi alarm from RW code

Extracted Entities

TypeKeyValueConfidenceEvidence
_no_entities backfilled 0%
File: Clients/Laguna/evernote/Laguna_Sanitation_Service.md
Updated: 2026-02-25 16:50:18.435562