← Tough

Clients/Tough/files/CCSD Water/WWTP/RAS control Strategy Final.pdf.md

gdrive
Source
1
Chunks
2
Entities
Doc
Type

Content

# RAS control Strategy Final.pdf > [Open in Google Drive](https://drive.google.com/file/d/1xWIHkx2oLlfvL8UF50mgvlvXMsh81Z5r/view) The document details the control strategy for Return Activated Sludge (RAS) pumps at the Cambria CSD wastewater treatment plant upgrade. It describes the use of variable speed submersible pumps controlled manually, by influent flow percentage, or set flow rate, with flow measured by specific meters. The strategy includes operational configurations for aeration basins and secondary clarifiers, operator controls at field locations and electrical rooms, and SCADA/PLC integration for pump control and monitoring.

Extracted Entities

TypeKeyValueConfidenceEvidence
site plant name Cambria CSD wastewater treatment plant 90% control strategy for Return Activated Sludge (RAS) pumps at the Cambria CSD wastewater treatment plant
system system integration SCADA/PLC 80% SCADA/PLC integration for pump control and monitoring
File: Clients/Tough/files/CCSD Water/WWTP/RAS control Strategy Final.pdf.md
Updated: 2026-03-04 18:40:54.461117