← Laguna

Clients/Laguna/files/Country Club/West_Pond_PLC_Implementation.pdf.md

gdrive
Source
1
Chunks
4
Entities
Doc
Type

Content

# West_Pond_PLC_Implementation.pdf > [Open in Google Drive](https://drive.google.com/file/d/1oiG6ihVenpQ3KJRu_AYiw5S_C1D3Bab-/view) The document details the implementation plan for the West Pond PLC controlling the Santa Maria Country Club recycled water delivery system. It includes I/O lists for analog and digital signals related to pond level, flow, valve position, and well control, along with tag structures for monitoring and control variables. The plan covers permissive and demand logic for recycle water and well operation, step-by-step PLC configuration and programming instructions, and a Factory Acceptance Test (FAT) checklist for system validation.

Extracted Entities

TypeKeyValueConfidenceEvidence
site Plant Name West Pond 90% West Pond PLC controlling the Santa Maria Country Club recycled water delivery system
site Location Santa Maria Country Club 90% West Pond PLC controlling the Santa Maria Country Club recycled water delivery system
system System Product PLC 80% step-by-step PLC configuration and programming instructions
system System Product FactoryTalk 80% Factory Acceptance Test (FAT) checklist for system validation
File: Clients/Laguna/files/Country Club/West_Pond_PLC_Implementation.pdf.md
Updated: 2026-03-04 18:40:55.018972