← Laguna

Clients/Laguna/files/Country Club/East_Pond_PLC_Implementation.pdf.md

gdrive
Source
1
Chunks
3
Entities
Doc
Type

Content

# East_Pond_PLC_Implementation.pdf > [Open in Google Drive](https://drive.google.com/file/d/1jw8gUUtkGUIoFjkbo1h_aerJ9YR-pOba/view) The document details the implementation plan for the East Pond PLC controlling the Santa Maria Country Club recycled water delivery system. It includes I/O lists for local and remote inputs/outputs, tag structures for pond status, level, flow, and valve control, as well as permissive and demand logic for valve and well operation. The file also outlines a step-by-step PLC build plan and a Factory Acceptance Test (FAT) checklist covering simulation, failure, and power/communication tests.

Extracted Entities

TypeKeyValueConfidenceEvidence
site plant name East Pond PLC 90% East Pond PLC controlling the Santa Maria Country Club recycled water delivery system
site location Santa Maria Country Club 90% Santa Maria Country Club recycled water delivery system
system product name FactoryTalk 80% Factory Acceptance Test (FAT) checklist covering simulation, failure, and power/communication tests
File: Clients/Laguna/files/Country Club/East_Pond_PLC_Implementation.pdf.md
Updated: 2026-03-04 18:40:55.248019