← Laguna

Clients/Laguna/Country-Club/slack/2025/07/2025-07-21_country-club.md

slack
Source
1
Chunks
7
Entities
Doc
Type

Content

# #country-club — 2025-07-21 **07:34 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753108485625419):** Do you have the Radio and POE adapter specified? Do you want Automation Direct terminal blocks or Wago? **08:20 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753111218736829):** Is a disconnect required, or is a circuit breaker sufficient? **10:53 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753120410886939):** Do we want panel fans and thermostats? **10:53 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753120421947029):** [[F096U2US6KW_autosys_country_club_panels.pdf]] **10:54 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753120471977709):** Let's go with Wago block **10:55 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753120538283699):** Here is the starting point. I need to add terminal blocks and get a few questions answered. Maybe 2 more hours of work to get one 100%. Then 30 minutes each to create the other 2 panels. **10:55 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753120550530779):** Do we want wire colors and sizzes? **10:56 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753120573009219):** I assume the incoming power will be 120VAC 15A? **10:58 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753120728624259):** Use this switch for POE and eth switch *Tycon Power Systems TP-SW5G-D-BT* **10:59 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753120741237429):** No disconnect **10:59 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753120790015279):** No to fans **11:00 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753120806144249):** Yes to colors and sizes. **11:00 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753120813024619):** Yes 120v **11:03 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753121031533929):** Is the IO list complete? It seems on the PID we need to control a valve? **11:04 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753121066378009):** Control is by sending a setpoint to the Cla-Val controller over modbus **11:04 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753121097411509):** same setup as Waller Park if you recall that job **11:05 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753121132424879):** Ohh gotcha. **11:06 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753121194752319):** sorry for the little rework on the eth switch. I just recently found these Tycon switches that do multi-voltage POE **11:07 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753121240327469):** Then radios will be on the pole **11:13 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753121592083589):** No problem. What items are connected to the switch? HMI, PLC, Radio? Anything else on each panel? **16:29 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753140597795439):** Nah that's all. **16:30 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753140625355059):** Sorry for the late reply. Tricia is sick so I've been doing all the chores, and I had to go in for a CT today **16:37 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753141042485789):** Can you use this logo for the drawings? ![[F096P2QS199_asi_logo_2025_info.png]] **16:48 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753141697165969):** Good start on the drawings. Appreciate you! **17:47 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753145276079019):** I will see if I can inset the logo. **17:48 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753145298765309):** We also do not have a convenience receptacle. Should I addd one? **17:48 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753145320009579):** good idea **17:48 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753145338534599):** can you develop the BOM for the terminal blocks also? **17:54 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753145646522639):** yes **17:54 [Kevin](https://slack.com/archives/C093BAYNUEQ/p1753145663042869):** thank you **20:20 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753154423496679):** Calling it a night. Pretty close. I think the only thing I am missing is fuses on the BOM. I will need to finalize the BOM, and link items to it on the drawing. Then create 2 more. **20:20 [Reno Hiltermann](https://slack.com/archives/C093BAYNUEQ/p1753154433422269):** Should be a gret starting point for ordering.

Extracted Entities

TypeKeyValueConfidenceEvidence
contact Person Reno Hiltermann 100% 07:34 [Reno Hiltermann]: Do you have the Radio and POE adapter specified?
contact Person Kevin 100% 10:54 [Kevin]: Let's go with Wago block
site Plant Name Country Club 100% #country-club — 2025-07-21
system Product Name Tycon Power Systems TP-SW5G-D-BT 90% Use this switch for POE and eth switch Tycon Power Systems TP-SW5G-D-BT
task BOM Finalization Finalize BOM including fuses and link items on drawing; create 2 more panels 80% I will need to finalize the BOM, and link items to it on the drawing. Then create 2 more.
task Add Convenience Receptacle Add convenience receptacle to panel 80% We also do not have a convenience receptacle. Should I addd one? good idea
task Develop BOM for Terminal Blocks Develop bill of materials for terminal blocks 80% can you develop the BOM for the terminal blocks also?
File: Clients/Laguna/Country-Club/slack/2025/07/2025-07-21_country-club.md
Updated: 2026-02-20 02:14:03.556709