**10:25 [Kevin](https://slack.com/archives/C093T9M10EQ/p1765909512182059):** For the record |
| contact |
Person |
Mason Radke |
100% |
**10:25 [Mason Radke](https://slack.com/archives/C093T9M10EQ/p1765909534819099):** ah good.. nice work |
| site |
Client Name |
Solvang-Water |
100% |
Client: Solvang-Water |
| site |
Plant Location |
HCA Well |
90% |
At HCA Well, set up a first scan bit to set the chem pumps into Auto. |
| task |
Add analog card to Zone 2 PLC |
Kevin to add analog card to first slot of Zone 2 PLC |
95% |
are you going to add the analog card to the first slot? ... Yes |
| task |
Connect Z2 flow meter |
Kevin to connect Z2 flow meter and Mason to verify Z1 performance |
95% |
I'll be connecting the Z2 flow meter today. ... verify you are happy with Z1 performance |
| task |
Set chem pumps to Auto at HCA Well |
Kevin set first scan bit to set chem pumps into Auto |
90% |
At HCA Well, set up a first scan bit to set the chem pumps into Auto. |
| task |
Download Zone 2 PLC program |
Mason to download Zone 2 PLC program after confirmation from Kevin |
90% |
something not happy with zone 2 PLC ... i can try to download |
| task |
Install flow meter |
Kevin to install flow meter on Zone 2 |
90% |
Flow meter install isn't gonna happen today. Parts are missing. |
| task |
Update code and scaling for Zone 2 |
Mason updated code and matched scaling to Zone 1 |
90% |
i got the code updated and matched scaling to zone 1 |