Kevin, I don’t believe the additional security is necessary as what happened was an accident. I believe the time stamp log and popup confirmation will more than suffice shall this occur in the future. Thank you, ![[20260407_19d6a53af181_image001.jpg]] Mychal Jones Plant Superintendent/Chief Plant Operator Phone 805-489-6666 ext. 103 Web https://sslocsd.org/ Email mychal@sslocsd.us 1600 Aloha Place, Oceano, CA. 93445 From: Kevin Seifert <kevin@autosysnet.com> Sent: Tuesday, April 7, 2026 3:59 PM To: Mason Radke <mason@autosysnet.com>; Mychal Jones <mychal@sslocsd.us>; Mason Radke <mason.radke@gmail.com>; Mike Arias <arias@sslocsd.us> Subject: Re: SCADA investigation Copy. Mychal, Are there any other operator actions that you think we should log besides this Stop WAS? Or would you like us to look into a cost estimate to implement security and logging? -Kevin Seifert, AutoSys LLC ________________________________ From: Mason Radke <mason@autosysnet.com<mailto:mason@autosysnet.com>> Sent: Tuesday, April 7, 2026 3:57 PM To: Kevin Seifert <kevin@autosysnet.com<mailto:kevin@autosysnet.com>>; Mychal Jones <mychal@sslocsd.us<mailto:mychal@sslocsd.us>>; Mason Radke <mason.radke@gmail.com<mailto:mason.radke@gmail.com>>; Mike Arias <arias@sslocsd.us<mailto:arias@sslocsd.us>> Subject: Re: SCADA investigation It’s not as straightforward as ignition but it’s possible. It would be a big job to implement security on this level but can be done. Logging the bit in historian is the quickest way to monitor this button action. Get Outlook for iOS<https://aka.ms/o0ukef> ________________________________ From: Kevin Seifert <kevin@autosysnet.com<mailto:kevin@autosysnet.com>> Sent: Tuesday, April 7, 2026 3:48:52 PM To: Mychal Jones <mychal@sslocsd.us<mailto:mychal@sslocsd.us>>; Mason Radke <mason@autosysnet.com<mailto:mason@autosysnet.com>>; Mason Radke <mason.radke@gmail.com<mailto:mason.radke@gmail.com>>; Mike Arias <arias@sslocsd.us<mailto:arias@sslocsd.us>> Subject: Re: SCADA investigation Mason, Is there an event log in FactoryTalk for operator actions that, if we had individual login's would log actions such as clicking the WAS Stop button? -Kevin Seifert, AutoSys LLC ________________________________ From: Mychal Jones <mychal@sslocsd.us<mailto:mychal@sslocsd.us>> Sent: Tuesday, April 7, 2026 10:02 AM To: Mason Radke <mason@autosysnet.com<mailto:mason@autosysnet.com>>; Mason Radke <mason.radke@gmail.com<mailto:mason.radke@gmail.com>>; Mike Arias <arias@sslocsd.us<mailto:arias@sslocsd.us>> Cc: Kevin Seifert <kevin@autosysnet.com<mailto:kevin@autosysnet.com>> Subject: RE: SCADA investigation Thank you for the information, Mason. Please proceed with implementing both of your proposed changes if possible. Kind regards, ![[20260407_19d6a53af181_image001.jpg]] Mychal Jones Plant Superintendent/Chief Plant Operator Phone 805-489-6666 ext. 103 Web https://sslocsd.org/ Email mychal@sslocsd.us<mailto:mychal@sslocsd.us> 1600 Aloha Place, Oceano, CA. 93445 From: Mason Radke <mason@autosysnet.com<mailto:mason@autosysnet.com>> Sent: Tuesday, April 7, 2026 9:43 AM To: Mason Radke <mason.radke@gmail.com<mailto:mason.radke@gmail.com>>; Mike Arias <arias@sslocsd.us<mailto:arias@sslocsd.us>> Cc: Mychal Jones <mychal@sslocsd.us<mailto:mychal@sslocsd.us>>; Kevin Seifert <kevin@autosysnet.com<mailto:kevin@autosysnet.com>> Subject: Re: SCADA investigation WAS Pumping System — Unplanned Shutdown Summary April 5, 2026 I looked into the unexpected WAS pumping shutdown that occurred at 11:58 AM on April 5. All trend values dropped at the exact same moment with no fault, interlock, or other automated condition that would explain it. The only alarm that fired was a low flow deviation on FIC4610, which was simply a result of the pumps stopping and not the cause. Based on everything we saw, the most likely explanation is that the SCADA Stop button was hit accidentally. To prevent this from happening again, two small changes are proposed: 1. Log the Stop command — Every time the WAS Stop button is pressed, a timestamped entry will be recorded in the data log. This gives a clear record to reference if something like this comes up again. 2. Add a confirmation step — A popup confirmation will be added to the Stop button so operators have a chance to cancel before the shutdown executes. This makes an accidental press a non-issue. Neither change requires any modifications to the PLC or field equipment. Please let me know if you would like me to spend time on this. I estimate 1-2 hours to get those changes implemented and tested. Mason Radke Autosys, LLC From: Mason Radke <mason.radke@gmail.com<mailto:mason.radke@gmail.com>> Date: Monday, April 6, 2026 at 2:05 PM To: Mike Arias <arias@sslocsd.us<mailto:arias@sslocsd.us>> Cc: Kevin Seifert <kseifert@nviro.com<mailto:kseifert@nviro.com>>, Mason Radke <mason@autosysnet.com<mailto:mason@autosysnet.com>>, Mychal Jones <mychal@sslocsd.us<mailto:mychal@sslocsd.us>> Subject: Re: SCADA investigation i can take a look this afternoon. i'll let you know if theres enough information logged to tell you for sure. would you like a confirmation pop up on that button? to help prevent it from being accidentally hit again? On Mon, Apr 6, 2026 at 1:59 PM Mike Arias <arias@sslocsd.us<mailto:arias@sslocsd.us>> wrote: Good Afternoon Gentlemen, Yesterday, 4/5/26 at approximately 11:58am our WAS pump shut down. We think we know what happened but are wondering if either one of you could confirm this for us? We believe that an Operator may have hit the stop button for the WAS pump. From the Aeration screen/button to the Secondary Clarifier and WAS button, then to setpoints. We believe that when the Operator was entering the wasting gallons for the day that the WAS pump Stop button was inadvertently pressed. Any was that you could confirm this for us? Thank you. Best regards, Michael Arias Michael J. Arias Operations Supervisor Grade III Operator South San Luis Obispo County Sanitation District 1600 Aloha Place, Oceano, Ca. 805-489-6666 [South San Luis Obispo County Sanitation District] -- -Mason

Extracted Entities

TypeKeyValueConfidenceEvidence
contact Mychal Jones Mychal Jones 100% Mychal Jones Plant Superintendent/Chief Plant Operator Phone 805-489-6666 ext. 103
contact Mychal Jones Email mychal@sslocsd.us 100% Email mychal@sslocsd.us
contact Mychal Jones Phone 805-489-6666 ext. 103 100% Phone 805-489-6666 ext. 103
contact Kevin Seifert Kevin Seifert 100% Kevin Seifert, AutoSys LLC
contact Kevin Seifert Email kevin@autosysnet.com 100% From: Kevin Seifert <kevin@autosysnet.com>
contact Mason Radke Mason Radke 100% Mason Radke <mason@autosysnet.com>
contact Mason Radke Email mason@autosysnet.com 100% Mason Radke <mason@autosysnet.com>
contact Mike Arias Michael J. Arias 100% Michael J. Arias Operations Supervisor Grade III Operator
contact Mike Arias Email arias@sslocsd.us 100% Mike Arias <arias@sslocsd.us>
contact Mike Arias Phone 805-489-6666 100% 805-489-6666
site SSLOCSD Location 1600 Aloha Place, Oceano, CA. 93445 100% 1600 Aloha Place, Oceano, CA. 93445
site SSLOCSD South San Luis Obispo County Sanitation District 100% South San Luis Obispo County Sanitation District
system FactoryTalk FactoryTalk 100% Is there an event log in FactoryTalk for operator actions
system Ignition Ignition 100% It’s not as straightforward as ignition but it’s possible
task Implement logging and confirmation popup Log Stop command and add confirmation popup on WAS Stop button 100% Log the Stop command ... Add a confirmation step ... popup confirmation