| server |
Pump Station PLC and HMI |
Waller Park pump station PLC and HMI |
85% |
managed via modifications to the existing Waller Park pump station PLC and HMI |
| site |
Project Location |
Santa Maria Country Club |
90% |
extension of its recycled water distribution system to the Santa Maria Country Club |
| site |
Client Name |
Laguna Sanitation |
90% |
control philosophy for Laguna Sanitation's extension of its recycled water distribution system |
| site |
Irrigation Ponds |
West and East irrigation ponds |
80% |
specifically for filling two irrigation ponds (West and East) |
| system |
SCADA System |
Laguna Sanitation WWTP SCADA system |
90% |
data communicated to the Laguna Sanitation WWTP SCADA system for monitoring and control |
| system |
Valve Product |
Cla-Valve solenoid-operated flow control valves |
85% |
integration of new Cla-Valve solenoid-operated flow control valves |
| system |
Control Panels |
pond supply control panels with PLCs and wireless communication |
80% |
pond supply control panels with PLCs and wireless communication |