Content
# SMCC_Logic_Build_Sequence_v2.docx
> [Open in Google Drive](https://drive.google.com/file/d/10CoQL5TUYn3xWfnGKkQ8QMUT0ovEI8V_/view)
The document details the PLC logic build sequence for the SMCC recycled water delivery system, covering the West Pond, East Pond, and Waller Park PLCs. It outlines the build order, dependencies, and testing procedures for pond level controls, valve and well commands, alarms, and priority sequencing. Setpoint values are to be finalized during commissioning, with logic development possible using placeholder data beforehand.