Content
# SMCC_Control_Strategy_Rev2.docx
> [Open in Google Drive](https://drive.google.com/file/d/1NhbqsYFXvkwFeQSlcrnFlwm2hzsBetby/view)
The document outlines the unified PLC control strategy for the Laguna County Sanitation District's recycled water delivery system to the Santa Maria Country Club's West and East irrigation ponds. It details the control logic, equipment, and communication setup involving the Waller Park tank and booster pumps, pond supply control panels, and integration via 900 MHz Ethernet radios using Modbus TCP. The strategy includes priority and parallel pond fill modes, PID valve control, well backup operation, alarm handling, and system intercommunications for SCADA integration.