Clients/Laguna/files/Country Club/PLC/Country Club/SMCC_Build_Sequence_Rev2.docx.md

gdrive
Source
1
Chunks
5
Entities
Doc
Type

Content

# SMCC_Build_Sequence_Rev2.docx > [Open in Google Drive](https://drive.google.com/file/d/1DT90WEdwFIVYmOA3v9AxAE_LSzzuSKbq/view) The document details the PLC build sequence for the SMCC recycled water delivery system at Laguna, focusing on the control logic and configuration for East and West Pond PLCs. It covers I/O setup, communication protocols (Ethernet/IP and RS-485), mode logic (OFF/AUTO/MAN), valve and well control based on pond levels, alarm conditions, and data publishing between PLCs and to the Waller system. The file also addresses behavior during communication loss and power-up, as well as Factory Acceptance Testing (FAT) procedures for valve and well operations.

Extracted Entities

TypeKeyValueConfidenceEvidence
site plant name Laguna 90% The document details the PLC build sequence for the SMCC recycled water delivery system at Laguna
site system name SMCC recycled water delivery system 85% PLC build sequence for the SMCC recycled water delivery system at Laguna
system communication protocols Ethernet/IP, RS-485 80% communication protocols (Ethernet/IP and RS-485)
system SCADA system Waller system 75% data publishing between PLCs and to the Waller system
task Factory Acceptance Testing FAT procedures for valve and well operations 70% Factory Acceptance Testing (FAT) procedures for valve and well operations
File: Clients/Laguna/files/Country Club/PLC/Country Club/SMCC_Build_Sequence_Rev2.docx.md
Updated: 2026-04-17 18:00:38.293177