← Tough

Clients/Tough/files/CCSD Water/SMCC_Control_Strategy_Rev3.docx.md

gdrive
Source
1
Chunks
6
Entities
Doc
Type

Content

# SMCC_Control_Strategy_Rev3.docx > [Open in Google Drive](https://drive.google.com/file/d/1FUJF_CKZRC_VcGo_wg39cGsmcsMLh0C7/view) The document outlines the control strategy for delivering recycled water from the Waller Park tank and booster station to the Santa Maria Country Club's West and East irrigation ponds. It details the distributed control system involving PLCs at Waller Park, East Pond (master), and West Pond (slave), with flow control managed via Cla-Valve integral pilots and communication over Ethernet/IP and RS-485. The wells operate independently with their run/fault status monitored by the pond PLCs, and the system includes master enable and fill mode controls published by Waller Park to regulate water delivery.

Extracted Entities

TypeKeyValueConfidenceEvidence
site Client Name Tough 100% Client: Tough
site Plant Location Waller Park tank and booster station 90% delivering recycled water from the Waller Park tank and booster station
site Irrigation Ponds Santa Maria Country Club's West and East irrigation ponds 90% to the Santa Maria Country Club's West and East irrigation ponds
system Control Hardware PLCs at Waller Park, East Pond (master), and West Pond (slave) 90% PLCs at Waller Park, East Pond (master), and West Pond (slave)
system Communication Protocol Ethernet/IP and RS-485 80% communication over Ethernet/IP and RS-485
system Valve Control Cla-Valve integral pilots 80% flow control managed via Cla-Valve integral pilots
File: Clients/Tough/files/CCSD Water/SMCC_Control_Strategy_Rev3.docx.md
Updated: 2026-04-17 17:30:43.862735