TSI

10
Documents
32
Entities
24
Chunks

Documents

DocumentSourceUpdated
📄 Clients/TSI/_other-info.md manual 2026-05-02 16:50:18.406750 View →
📄 Clients/TSI/slack/files/image_1.md slack 2026-03-09 16:11:17.036050 View →
📄 Clients/TSI/slack/files/image.md slack 2026-03-09 16:11:16.893207 View →
📊 IO TASK HOURS ESTIMATE gdoc (sheet) 2026-03-04 01:31:30.667739 View →
📄 Clients/TSI/slack/2025/11/2025-11-10_tsi-capp.md slack 2026-02-20 02:20:32.412747 View →
📄 Clients/TSI/slack/2025/11/2025-11-12_tsi-capp.md slack 2026-02-20 02:20:32.209880 View →
📄 Clients/TSI/slack/2025/11/2025-11-07_tsi-capp.md slack 2026-02-20 02:20:32.149965 View →
📄 Clients/TSI/slack/2025/11/2025-11-08_tsi-capp.md slack 2026-02-19 20:30:30.874429 View →
📄 Clients/TSI/slack/2025/11/2025-11-13_tsi-capp.md slack 2026-02-19 20:30:30.835954 View →
📄 Clients/TSI/slack/2025/11/2025-11-11_tsi-capp.md slack 2026-02-19 20:30:30.662912 View →

Entities

TypeKeyValueConfidenceEvidence
contact Kevin Kevin 90% **17:15 [Kevin](https://slack.com/archives/C09RQLEH9C4/p1762910106007659):**
contact Mason Radke Mason Radke 90% 16:14 [Mason Radke]
contact Kevin Kevin 90% 16:13 [Kevin]
contact Mason Radke Mason Radke 90% **17:16 [Mason Radke](https://slack.com/archives/C09RQLEH9C4/p1762910217026679):**
_no_entities backfilled 0%
_no_entities no_text_content 0%
_no_entities no_text_content 0%
_no_entities none_found 0%
site Client TSI 100% Client: TSI
site Client TSI 95% Client: TSI
site Membrane Filtration System scope MSS responsible for controlling all equipment related to MFS 90% The MSS shall assume responsibility for controlling all equipment related to MFS
site Membrane Filtration System MFS 90% control narratives that are to be in the MFS (Membrane Filtration System) PLC
site Competitor integrator Cannon 80% Cannon for sure. They are listed as the current district integrator
site Other competitors Tesco, Quantum, Northern Digital 70% probably others like Tesco, Quantum, Northern Digital, etc
system SCADA product Ignition 100% for ignition no. my UDT with the AOI handles all the alarming on the ignition side
system Product Ignition 100% Ignition!! Dude we got this. Gold certified
system Pax Pax 70% I'm thinking in Pax, where you add an AOI for digital input, analog input
task Most Complex High Complexity Narrative UF/RO CIP Cleaning Sequences with Chemical Interlocks 95% the single most complicated control narrative ... UF/RO CIP Cleaning Sequences (with Chemical Interlocks)
task Most Complex Medium Complexity Narrative Purified Water Pump PID Speed Control 90% most demanding narrative in the Medium Complexity tier is the Purified Water Pump PID Speed Control
task Programming work estimate at least 3 months of work just to program 90% just off the cuff I'm thinking at least 3 months of work just to program
task Most Complex Low Complexity Narrative Custom Alarm Procedure Logic (Disabling Alarms during Flush/Stabilization) 90% most demanding narrative in the Low Complexity tier is the Custom Alarm Procedure Logic
task Estimate programming time for control narratives Estimate 2-5 days programming plus 1 day in-house testing 85% solid week would be good to get that written and polished...in-house testing would only take a few hours
task Estimate logic for narrative Estimate logic for the narrative only, IO handled separately 80% @Mason Radke when you do your estimate, only estimate the logic for the narrative
task Count equipment with IO Kevin counting equipment with IO from P&IDs for labor pricing 80% I am going through the P&IDs now and counting equipment that has IO
task Injection Well Operation 3.33 review Review Injection Well Operation 3.33 narrative 80% most complex narrative that is our responsibility will be the Injection Well Operation 3.33
task Programming and integration of Ethernet IP VFDs Add time for integrating Ethernet IP devices 80% I think all vfds are ethernet...Eth IP...time required to integrate ethernet IP devices
task Estimate hours for 3.31 Purified Water Pumps 30-40 hours programming estimate 80% 3.31 i feel like 30-40 hours as well
task Estimate hours for 3.13 Waste Equipment Tank 20 hours, likely complete in a day 80% 3.13 waste eq tank...20 hours.. likely complete in a day
task Estimate hours for 3.8 UF Feed Chemicals 20-30 hours programming estimate 80% 3 chemicals.. 2 pumps each...20 hours. 30 feels safer
task Create spreadsheet for IO task hours estimate Kevin to create spreadsheet for estimated hours for AOIs and IO logic 80% I will have a quick spreadsheet made up for you to check my estimated hours
task Screen creation for plant functions Time estimate for creating screens for each plant function narrative 75% time estimate to creating a screen(s) for each plant function (narrative)
task Estimate hours for 3.23 Sulfuric Acid 10-20 hours conservative estimate 75% 3.23 Sulfuric Acid...one day.. 10 hours. 20 to be conservative